Power - Hydro turbine - 2,000 kW

Template assignment

Base case
  • Central grid connection
Proposed case
  • 2 MW run-of-river hydro plant with 80% capacity factor
  • Cost is $5,000/kW installed, no dam required
  • Electricity can be sold to grid for $0.10/kWh
  • Operating cost are $200,000 per year
  • Project life is 35 years
Solution

The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.