Energy efficiency measures - Industrial - Ventilation - Heat recovery

Template assignment

Base Case
  • Several large makeup air units use glycol as heat transfer fluid
  • Building fan and ventilation systems are on constantly
  • Air flow rate is 350,000 m³/h with 100% fresh air
  • Intake air damper is leaky
  • Space heating temperature is constant at 20ºC
  • Heating/cooling changeover temperature is 20ºC
  • Natural gas fired steam boiler seasonal efficiency is 75%
  • Natural gas rate is $8.5/GJ

Proposed case
  • Minimise usage: reduce flow by 10% and install heat exchanger on ventilation system, heat exchanger efficiency is 15%, cost is $120,000
  • Maximise efficiency: install economizer on boiler stack to preheat feedwater, increasing boiler efficiency to 80%, cost is $100,000
  • Optimise supply: recover heat from other system (economizer on a furnace), heat recovered 2,800 MWh, cost is $340,000

Base case

Base case
Proposed case

Proposed case
Solution

The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.