- A 7 kW diesel-powered electric generator runs for around an hour per day
- The generator supplies some loads directly, but mainly charges a battery bank
- AC loads are met by the battery bank through an inverter when generator is off
- Diesel fuel rate is $1.00/L
- The generator’s heat rate is 18,000 kJ/kWh
- Maintenance of the diesel generator costs around $300 per year
- Average AC load is 4 kWh/day and average DC load is 1 kWh/day
- The annual peak load is 7 kW
- A wind turbine is added to the base case diesel generator/battery system. The diesel generator runs only when the wind turbine is unable to keep the batteries fully charged.
- Batteries and inverter are the same as in the base case
- The proposed wind turbine production data are as follows:
- The proposed turbine has a swept area of 5.7 m2 and a rotor diameter 2.7 m
- Wind speeds at a 20 m height are estimated to average 6.0 m/s from November through March, 4.0 m/s in June through August, and 5.0 m/s in the remaining months
- Wind shear exponent is 0.15, annual air temperature and atmospheric pressure are the same as the one measured at nearest climate data location
- The turbine costs $3,500; a 20 m guyed tower costs $1,000; the homeowner will do most of the installation, such that additional costs will be only $1,000
- Maintenance costs for the turbine are expected to average $300 per year
The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.