Power - Wave power - 2,250 kW
Template assignment
Base case
The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.
Template assignment
Base case
- Central grid connection
- Project located in Agucadoura, Portugal (nearest weather data is Santa Maria Island)
- Three 750 kW offshore articulated linear attenuator wave power systems
- Capacity factor estimated to be 30%
- 3 km seabed transmission cable to on-shore central grid connection
- Cost of complete installation $12.3 million
- Preferential wave power feed-in tariff permits electricity to be sold at $0.35/kWh
- Annual operating and maintenance costs are estimated at $0.05/kWh
The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.