Power - Hydro turbine - Reservoir - 350 kW

Template assignment

Base case
  • Central grid connection
Proposed case
  • A mini hydro project at an existing dam on moderate-sized lake
  • Gross head is 15 m
  • Maximum tailwater effect is 2.0 m
  • A residual flow of 0.5 m3/s must be maintained
  • Percent time firm flow available is 100%
  • A single Kaplan turbine with a design flow rate of 3 m3/s will be installed
  • Kaplan turbine design coefficient is 4.5
  • Cost of turbine and civil works (penstock, dam modifications, etc.) is $5,000/kW
  • Flow-duration curve data are as follows:

  • Maximum hydraulic losses are around 7%, miscellaneous losses are around 2%
  • Generator efficiency is 95.0%
  • Power system availability is 96.0%
  • Electricity will be sold at $0.10/kWh
  • O&M for water rights, land usage, and a part-time operator is $30,000 annually
Solution

The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.