Power - Steam turbine - 500,000 kW

Template assignment

Base case
  • Central grid connection
Proposed case
  • Steam flow at the inlet of the steam turbine is 1,600,000 kg/h
  • Availability of power system is 90%
  • 21 MPa steam turbine operating pressure and 540°C superheat temperature
  • 7 kPa back pressure
  • 80% steam turbine efficiency
  • These numbers should result in an electric capacity of about 500 MW
  • Minimal capacity of 40%
  • 80% steam boiler seasonal efficiency
  • Total cost of project estimated at $1,100/kW
  • Delivered cost for coal of $70/t
  • Operating and maintenance costs are 2.5% of initial costs
  • Electricity to be sold to the grid at $0.045/kWh
Solution

The worked-out solution is the data file selected from within the RETScreen Project Database. The user automatically downloads the Project Database file while downloading the RETScreen software.